Panagarh-Palsit and Durgapur Expressways
India (2002 - 2005)

The Panagarh-Palsit and Durgapur Expressways, which form part of West Bengal’s National Highway 2, were the first of Gamuda’s foray into the international civil infrastructure market. The colossal task involved the upgrading and building of a combined length of almost 130km of roads on a Build-Operate-Transfer (BOT) basis.

As the BOT contractor for the project, the scope of works was wide and varied, including the design, supervision and construction of the entire project that comprised the development of service roads, bridges, interchanges, numerous underpasses and overpasses, culverts, a maintenance yard, bus shelters, toll plaza and toll booths.

Works for the new expressways were conducted alongside the old road, much of which traversed through densely populated areas in the cities.

Upon completion, Gamuda operates and maintains the expressways under a 15-year concession period on annuity basis with the National Highways Authority of India.

Panagarh-Palsit Expressway, India

Client National Highway Authority of India
Concessionaire Mapex Infrastructure Pte Ltd
EPC Contractor Gamuda – WCT (India) Pte Ltd
Scope of Works
  • Design
  • Construction
  • Supervision
  • Commissioning
  • Upgrading of the existing 2-lane road into 4 lanes of Panagarh-Palsit Section National Highway 2 (NH-2) in West Bengal, India
Construction Cost US$460 million
Project Facts
Length: 64km
Carriageway Width: 3.5m/lane
Number of Lanes: 4
Service Road: 19km (7m wide)
Interchanges: 2
Rail Over Bridge (ROB): 1
Minor Bridges: 5
Underpasses &
Overpasses:
11
New Culverts & Existing
Culverts to be upgraded:
69
Project Implement Unit (PIU) Building: 1
Wayside Amenities – Service Area: 1
Maintenance Yard: 1
Truck Lay-bys: 4
Bus Bays & Bus
Shelters:
16
Toll Plazas: 2
Toll Booths: 22

Durgapur Expressway, India

Client National Highway Authority of India
Concessionaire Emas Expressway Pte Ltd
EPC Contractor Gamuda – WCT (India) Pte Ltd
Scope of Works
  • Design
  • Construction
  • Supervision
  • Upgrading of the existing 2-lane road into 4 lanes of Durgapur Expressway (Palsit to Dankuni Section) of National Highway 2 (NH-2) in West Bengal, India
Construction Cost US$460 million
Project Facts
Length: 64km
Carriageway Width: 3.5m/lane
Number of Lanes: 4
Service Road: 84km (6.75m wide)
Interchanges: 3
Rail Over Bridge (ROB): 1
Minor Bridges: 21
Underpasses &
Cattle Crossings:
10
Overpasses & Flyovers 6
New Culverts & Existing
Culverts to be upgraded:
263
Maintenance Yard: 1
Truck Lay-bys: 4
Rest & Service Areas: 1
Toll Plazas: 2
Toll Booths: 22